|
| |
|
|
The Town of Bennington includes 3 of the several components
of the power plant / pipeline project:
the Vermont terminus of the proposed
Iroquois Gas
natural gas pipeline;
the southern terminus of the proposed
NYSEG/SVNG
gas pipeline and its link to the Iroquois pipeline;
the 270 MW gas-fired
electric generating plant
proposed by
VEPH.
|
|
Bennington members of the VCE Advisory Board: Mike Bethel, Terry Ehrich, Thomas F. Keefe, Carol Moses
|
|
|
|
Copyright © 1999 by Vermonters for a Clean Environment
Updated: October 15, 1999
|
|